ICE TUNNEL 2023

Ice Tunnel Body

3D scan of the Ice Tunnel - May 2021

The Ice Tunnel story could be one more of the multiple observations of destructive events happening at global scale due to the GLOBAL WARMING. Since 2021, I have been personally and emotionally engaged following the dramatic changes occurring in real time in the region of Arolla in the Swiss Alps. I have been observing and collecting 3D data scans, video sequences, drone visuals and photography of the ongoing spectacular decadence of this very singular Ice Tunnel which had opened up from the top of the gallery couple years ago and he has now, this very last September 2022, gone away forever after countless years of existence. Suddenly, this archive collected between 2021-22 has become an unsuspected and precious testimony. In 2021, I had the feeling that this tunnel with its ephemeral beauty and dangerousness was going to disappear within the next 5 years with the best hopes. The thickness was still significant but the dramatic heat of Summer 2022 got reason of it! MELT IN PEACE.


The datas are undergoing experimental production for upcoming future events. More material and infos will be added on the website soon!

Ice Block

Reminiscent Ice Block - 3D scan 1min

MARCH 4th 2023 INTRODUCTION 1:20 min

Drone video (raw mat) 2.06min - Global site view after the collapse, october 2022


This ephemeral ICE BLOCK has now melted down, it has fully disappeared a month after the scanning in October. The ICE BLOCK was standing as a sculptural element in the front of the SMASHED body skeleton as a flagship reminiscence of the Ice Tunnel and its phenomenal beauty.

Melt In Peace

September 2022 - After the collapse

September 2022 - After the collapse

September 2022 - After the collapse which has been accelerated by the 2022 spectacular hot summer!

May 2021 - Bottom entrance
January 2022 - the ice at the bottom of the tunnel has fully disappeared

May 2021 - The Ephemeral Ice Tunnel is still filled up with ice. About 200m long.

May 2021 - Upward the top entrance

May 2021 - Upward the top entrance

May 2021 - Bottom entrance

December 2021 - Bottom entrance
June 2022 - Bottom entrance

May 2021 - Top entrance

December 2021 - Bottom entrance

June 2022 - Bottom entrance

June 2022 -Top entrance

June 2022 -Top entrance

May 2021 - Top entrance

January 2022 - the ice at the bottom of the tunnel has fully disappeared

Installation display testing at StudioLab. 4K video projection layering on tulle fabrics. Dimension: 7x3,5x4m

SMASHED FRAGMENTATION

BLEEDIND TRANSFORMATION 3D SIMULATION

Symbiotic fragmented transformation of the ICE BLOCK in progress

THE SMASHING NIGHT VIBRATIONS MAGNET

Immersive Installation « DEEP » - 30sec (VR option)
4K NFT 2022